We are specialists in providing Steel Erection Method Statements and have more than 30 years’ experience within this industry. Our consultant has previously worked as a Steel erection contracts manager and has worked on buildings up to 2000 tons.

Steel Erection method statement

Tower Crane
Services Law firm Services Img 3

train station renovation (2016-2017)

We Can Help Produce your Steel Erection Method Statements

Whether you are a steel fabricator who needs help producing a method statement or have a backlog of work and does not have the time or resources to submit your method statements / Risk assessments, Rmt Solutions can help provide a quick, effective solution.

With our working background in steel fabrication and steel erection, we have all the necessary knowledge to provide high-quality documentation that will ensure the quick approval of the documents so there will be no delays from starting on site.

Our consultant has worked in the fabrication industry since leaving school, working from the shop floor and on-site installing steelwork, then eventually moving into the management of running fabrication shops and site operations as a Contracts Manager.

We also work with several Main contractors providing a checking service for lifting operations so you can be reassured that we are fully compliant with their required standards.

We have also invested in the correct software to ensure that our documents are the best available and use the Crane Manufactures Sofware such as LICCON or similar used by other crane manufacturers and Autocad for lift plans using Revit to check the plant and MEWPS are suitable.

We can also prepare the method statements from a Db1 file produced in Tekla, meaning we can start on the method statement well before the full detailing of the steel frame has been completed.

 

We can provide visual standards for unloading steelwork, Installing Precast stairs, or any standard you require. We use Adobe software to ensure all our documents are professionally designed.

Having visual standards outside your method statement helps to cut down the size of the main method statement and ensure that standards are maintained, providing a safe system of work.

 

We can provide visual standards for unloading steelwork, Installing Precast stairs, or any standard you require. We use Adobe software to ensure all our documents are professionally designed.

Having visual standards outside your method statement helps to cut down the size of the main method statement and ensure that standards are maintained, providing a safe system of work.

Whatever you require concerning Steel installation or any safety aspect, we can design a document complete with your Company Logo; this will show the Main contractor that you are serious about health and safety and how your company operates on-site.

RMT Solutions can help you detail your lift plans using LICCON or similar manufacturer’s software as well as using Autocad and Revit.

If you have your appointed person and only want the lift plan detailing from the information you have provided by, marking up the positions on the drawing.

We can also check all the steel member weights and ensure that the correct crane has been selected.

Lift Plan
Mobile Crane Lift Plan

Health and Safety Audits

As part of our services, we can complete your health and safety audits; our consultant has a Health and Safety Diploma and CPCS A61; this puts us in a much better position when auditing steel frames.

We can provide advice on all aspects of the installation from unloading, installation of steelwork, positive lifting methods, installation of precast units, installation of precast stairs.

With decades of experience within the fabrication industry, we understand how steel frames are installed and the best ways to archive them safely.

All site audits are conducted using class-leading software that quickly and effectively provides a professional report.

 

Our Clients